#157: Asset Upgrade & Replacement / 1. Project Planning / Build Storage Shed, South Lot / Completed
Status: Completed
Due: Apr 17, 2026
Assignees: Darrell Finley
  • 24 x 30 ft pole frame, 10 ft eave, metal roof and siding
  • 4 in concrete slab
  • One 10 x 10 roll-up door, one walk door
  • Lights and two outlets, fed from the shop panel
  • Contractor pulls the building permit
Created by Vicky Sep 17, 2026