How_to_use_this_template
📖 How to use this template
One flat list of everything a small product team currently owes, sorted by priority rather than filed into phases. No sections, no nesting, no ceremony. The sample is a web team's open work: page updates, API changes, a few fixes.
- Duplicate this project into your own organization (dropdown next to the project name, then
Duplicate) - Delete the sample items and add your own. Keep them at the top level. The flatness is the point, and a list you have to expand is a list nobody reads.
- Set a priority on every item: Urgent, High, Medium or Low. This is the only ordering the project has, so an untriaged item is invisible work.
- Assign each item to a person, not a team, then switch to Board view grouped by assignee to see who is carrying what
- Tag by the kind of work:
new_feature,design,specs,documentation,routine,check. Swap these for whatever categories your team actually argues about.
Three statuses carry an item end to end: To-do, In progress, Completed. Deliberately short. A longer pipeline is worth having when work waits on other people, and this template assumes it mostly doesn't.
Dates are optional here and most items don't have one. Use a due date when something is genuinely time-boxed, and a start date when it is waiting on a date to begin. Leaving both empty is a legitimate answer, which is why priority does the sorting instead.
Two habits keep it usable. Triage new items the day they arrive, because a flat list with no priority is just a pile. And close finished items rather than leaving them at Completed forever, since the value of one list is that its length means something.